Recent Case Studies
Halfen Brickwork Support at M62 Link Road Bridge
M62 Junction 6 / M57 Link Road
Cityroofs Aquadyne® Living Wall
Address
Select Download
---------------------
Full List
- Cast in channel
- Reinforcement
- Precast
- FPA & SPA
- Brickwork
- Stone
Select Download
---------------------
Full List
- Cast in channel
- Reinforcement
- Precast
- FPA & SPA
- Brickwork
- Stone
Quick information
---------------------
Brickwork supports
Brickwork ties
Cantilever brackets
Cast-in Channels
Cast-in hoop lifting
Column Shoe HCC
Corner guards
CRET shear dowel
DETAN tension rod
HIT balcony system
Kwikastrip
Pipe clamps
Plain back channel
Pourstop & skis
Powerclick systems
Precast panel support
Precast sandwich
PS reinforcement
Rapid safety lifting
Rebar couplers
Stone support
Threaded lifting
Wind posts
Technical Support
Academy e-Learning
My Halfen
Home
News
Text size:
A
A
A
Products
Case Studies
Support
Company
Contact
Cast-in channels and accessories
Concrete reinforcement products
Precast lifting and support systems
Brickwork supports, restraints and facade systems
Framing systems
Cast-in channels
Pourstop and Skis
Corner guards
Rebar couplers
Kwikastrip
Punching shear reinforcement
HIT balcony connection system
CRET Shear Dowel Connector
Column Shoe HCC
HFR Fibre Reinforcement
Rapid safety lift systems
Threaded lifting system
Cast-in hoop lifting system
Precast panel support
Precast sandwich panel system
Brickwork supports
Brickwork ties and restraints
Wind posts
Stone support and restraint
DETAN tension rod system
Powerclick systems
Plain back channel
Pipe clamps
Cantilever brackets
FAQs
Education
Downloads
Halfen Academy
Industry Issues
Product Seminars
CPD Seminars
About Us
Newsletters
Links
Agents
Halfen Brickwork Support at M62 Link Road Bridge
Having contacted Halfen, a solution was provided in the form of a "grid" of Halfen framing channels which allowed the brickwork contractors - Laing O’Rourke Infrastructures, to fix the brickwork back to the variable backing structure whilst providing the adjustability and flexibility required to create a clean brick facade. Halfen 50/40 HL slotted-back channels were fixed back to the piles at 450mm vertical spacings, to which 28/15 HL channel was attached for the brick restraint ties. Using the channels resulted in a quicker build due to the fact that no drilling/fixing was required, allowing the build to proceed quickly and continuously. The use of the channel also virtually eliminated dust and noise created when installing the brickwork. The two new free-flow link roads at M62 Junctions 6 were created to relieve the heavily congested roundabout known locally as "Tarbock Island". It is intended that the improvements will bring considerable road safety benefits, reduce congestion and driver stress and improve the reliability of journey times. Click Here to view the HL/HM Halfen Channel range
Products used
Brickwork ties and restraints
Case Studies
Downloads
M62 pdf
web design kent